Projects Undertaken

  1. OPTICAL FIBER (OPGW/ADSS)
  1. SDH MULTIPLEXERS /PLC EQUIPMENT
  1. LOGISTICAL CAPACITY
  1. CONSULTANCY

OPTICAL FIBER (OPGW/ADSS) - 2017-2021


  • Installation, splicing and commissioning of underground fiber optic cables in Pokuase, Tarkwa, Bogoso, Dunkwa and Obuasi
  • Tower erection, Conductor and optical fiber (OPGW) stringing between Kigali and Nyanzu in Rwanda
  • Splicing of OPGW between Kigali and Nyanzu.
  • Installation, Splicing and Commissioning of 188km OPPC (Fiber) on a 225kV transmission backbone from Navrongo to Ouagadougou (Burkina Faso).
  • Installation, Splicing and Commissioning of 194km G.655 (NZDS) Optical Fiber (OPGW) on a 330kV transmission backbone from Bolgatanga to Tamale.
  • Installation, Splicing and Commissioning of 178km G.655 (NZDS) Optical Fiber (OPGW) on a 330kV transmission backbone from Tamale to Kintampo.
  • Installation of 4 ODF at Bolgatanga, Tamale, Kintampo and Kumasi substations.
  • Installation, splicing and testing of Underground fiber cables at Kintampo, Tamale and Bolgatanga substation
  • Installation, splicing and testing of underground fiber cable for METKA Power plant
  • Installation, splicing and testing of underground fiber cable for Sino hydro Corporation in Bolgatanga
  • Installation, splicing and testing of underground fiber cable for Sieyuan Company in Bolgatanga
  • Installation of 96 core and 48 core Backbone and distribution Optical fiber cables within the Monrovia Metro
  • Installation and termination of distribution cabinets within the Monrovia metro.
  • Deployment of G-PON services within the Monrovia metro
  • Survey and audit of the Eastern corridor fibers for National Communication Authority (NCA)/SmartInfraco in Ghana

SDH MULTIPLEXERS /PLC EQUIPMENT


  • Integration of ABB FOX 515 with HUAWEI OSN 3500 between Ghana and Burkina Faso.
  • Installation, configuration and Commissioning of GE PLC E-TERRA GRIDCOM equipment at Bolgatanga 2 substation.
  • Installation, Configuration and Commissioning of GE LMU (Line Matching Unit) at Bolgatanga 2 substation.
  • Installation, Configuration and Commissioning of GE E-terra Gridcom DIP Tele protection Equipment at Bolgatanga 2 substation

LOGISTICAL CAPACITY


  • We own six (6) Fusion Splicers (FUJIKURA and COMPTYCO brands) for our jobs. We also have four (4) OTDR testing machines available for work.
  • Paramount Resources operates with a team of experts and technicians with two (2) rugged pickup vehicles for transportation of materials and personnel for maintenance services.
  • We have in stock over 1000km length of single mode optical fiber approach cables (G.652) for maintenance services.
  • Blueprint can adequately meet the supply needs of any quantity of optical fiber cables and accessories requested for any project.
  • Our FTTH teams are capable of carrying out 384 precision core terminations in a day with splice loses of 0.00db - 0.01db.

CONSULTANCY


  • Consultant for Liberian Telecommunication Corporation (LTC):
    • Conducted a comprehensive Optical fiber infrastructure audit of the existing backbone and access networks and proposed a robust topology with redundancy to prevent system failure.
    • Trained personnel of LTC on modern trends in optical fiber technology.
    • Conducted full scale Equipment and tools audit and made recommendation to LTC on same.